ROADS AND MAINTENANCE REPORT

10/12/2010

On October 1, Clint Dalton, Jerry Billingsley, Ralph Moore and I met with Brian Jones of W L Construction to inspect the cracks on Ridge Drive, and Longmeadow. Brian stated that sealing the cracks would give the pavement better longevity, but he felt that the job should hold up for the expected 10 years by doing nothing to the cracks. His company does not do the crack filling with sealant, but would cost 50 cents/ foot by a contractor who does. Ralph has offered to seal some of the cracks at no labor cost to MALA. I feel we should pick several of the larger cracks to seal and then evaluate after the winter to see if it is worthwhile to do that or not.

Respectfully submitted,

Michael Gupton, Chairman